Ei! Não deixe de visitar as outras páginas!

segunda-feira, 4 de novembro de 2013

Tepco simulates “Contaminated water overflows by June 2015″ - FUKUSHIMA MAIS MORTÍFERA QUE HIROSHIMA, NAGAZAKI E CHERNOBYL JUNTAS 4


Leia (em português) uma introdução à esta série de posts aqui.






Even from Tepco’s estimate published on 10/31/2013, they will run out of the contaminated water storage facility by June 2015.

Tepco is planning to build 15 new tanks every month in 2013. From 2014, they originally planned to increase the storage capacity from
500,000m3 to 700,000m3 by 2015, but they increased this planned capacity to 800,000m3 for this simulation. However, contaminated water increases faster than Tepco builds new tanks.

This simulation is on the assumption that they don’t discharge the groundwater pumped up from the bypass wells, nor don’t have the sub-drain system into operation. (cf, Read the column about what the bypass wells and sub-drain are for, “[Column] Kamikaze and contaminated water [URL]“)

Considering the crippled plant situation and Tepco’s past operation skills, this assumption seems rather realistic.

If the plant has another heavy rain or typhoon and they end up having to stock the contaminated rainwater, they would run out of the...LINK

Leia (em português) uma introdução à esta série de posts aqui.
















Nenhum comentário:

Postar um comentário

Seus comentários, críticas ou elogios farão meu blog evoluir. Obrigado por participar.

Related Posts Plugin for WordPress, Blogger...